View Single Post
Old 04-09-2007, 04:07 PM   #1
990445
Initiate
 
Join Date: Apr 2007
Posts: 1
990445 is unknown at this point
Sony Vegas timeline/playback problem

I can't figure out how to extend the timeline of the video to match the playback speed. The video im trying to edit is 2 minutes long. I change the playback rate to .750 but instead of adjusting on the timeline it stays at 2 minutes. I render it thinking it would adjust by itself but it doesn't. The video should be longer in time.

Ive tried looking through all the options and doing searches and can not find the answer. Please reply if you know what I am doing wrong or how I can extend the time on the timeline. Thanks
990445 is offline   Reply With Quote